Please click on image to ENLARGE photo of view northeast from W. Center Street where Sweetser crew members are rapidly replacing an old rock-walled storm drain with a new concrete culvert. The big, blue plastic hose is designed to collect water flowing from the Dickson Street area to be pumped across the street to reenter Tanglewood Branch downstream. This reduces the load of mud from the construction site and thus the load of silt flowing toward Beaver Lake.
Thursday, September 11, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment